Built for the game.
Made for every move.
Bring your hockey field to life. Plan a surface for school sport, club training and competition.
Global brand. Local expertise.
Aneka Usaha — Authorised FieldTurf representative
Visit FieldTurf's official websiteFIH Preferred Supplier
Hockey turf · FieldTurf
Listed in the FIH supplier directory
FIH Approved Product — Global
Hockey Gold Speed L 13-31 IS 15
Catalogue certificate: 2018-027
Manufacturer Authorisation
Aneka Usaha · Hockey, football and rugby
31 Dec 2025–31 Dec 2030
Preferred Supplier is a manufacturer credential. Product approval applies to the specified turf and shock-pad system; certification of an installed field requires separate testing and approval. The catalogue certificate relates to the 2017 standards edition and a water application of 3 litres/m². Confirm the current specification for your project.
View certificate and supporting documents
View FieldTurf’s official FIH listing · Product and document information: Aneka Usaha Hockey Catalogue 2026.
Your field. Your priorities.
Start with who will use the facility and how often. Build your surface specification, construction scope and care plan around the needs of your players.
Space to learn.
Room to grow.
Plan for lessons, shared use and regular play, with access and practical maintenance in mind.
A field for
your programme.
Discuss training frequency, playing demands and the day-to-day needs of your club.
Start with the
right specification.
Identify your intended level of play and confirm the applicable performance and testing requirements.
13-31
FieldTurf
Hockey Gold 13-31.
A synthetic hockey turf solution presented by Aneka Usaha for dedicated hockey field projects. The surface forms part of a complete field system that must be considered together with its supporting construction and installation requirements.
Final product specification and system requirements should be confirmed for each individual project.
Meet FieldTurf
Hockey Gold Speed L 13-31 IS 15.
A non-filled hockey turf with curly polyethylene monofilament fibres. The catalogue’s tested system combines a 13 mm pile with a 15 mm IS 15 shock pad and irrigation for Global-category performance.
Hockey-specific fibres.
The catalogue describes an elliptic fibre shape and texture developed for hockey ball movement and player interaction.
One complete playing system.
Specify the carpet, supporting layer, base and irrigation together. A change to a component needs assessment as part of the complete system.
| Product / tested system | Hockey Gold Speed L 13-31 IS 15 |
|---|---|
| Turf construction | Non-filled, tufted curly monofilament |
| Pile material / profile | Polyethylene / elliptic |
| Declared pile height | 13 mm |
| Declared tuft density | 65,092 tufts/m² |
| Declared pile weight | 1,680 g/m² |
| Primary backing | Polypropylene and polyester |
| Secondary backing | Butadiene styrene |
| Carpet installation | Bonded joints; loose-laid carpet |
| Tested shock pad | FieldTurf IS 15; 15 mm |
| Shock-pad composition | 2–4 mm SBR rubber granules with 10% binder |
| Tested watering application | 3 litres/m² |
Manufacturer-declared values from the Sports Labs report dated 14 February 2018, reproduced in the 2026 catalogue. Tolerances and measured values are in the report. Confirm the current product data and project specification before ordering.
Request the hockey turf specificationView the turf and shock-pad specification pages
Preferred.
Built around recognised
hockey field standards.
FieldTurf is presented in our project documentation as an FIH Preferred Supplier, supporting the delivery of high-quality hockey turf and field solutions.
The FIH Preferred Turf & Field Supplier framework covers organisations working to provide hockey fields suitable across different levels of the game.
More than
just the turf.
A hockey field is a complete construction system. From preparing the base to laying the playing surface, each stage helps shape the finished facility.
- 01
Existing turf removal
Remove the existing carpet and inspect the exposed surface before upgrading works begin.
- 02
Base preparation
Complete the required milling, subsoil drainage and premix works for the specified field system.
- 03
Shock pad / E-layer
Install the elastic layer over the prepared base as part of the agreed turf system.
- 04
Hockey turf installation
Lay the turf rolls, form the joints and complete the playing lines to the approved layout.
- 05
Field testing
Carry out the required surface tests after installation. Certification depends on the applicable testing and approval process.
- 06
Completion and handover
Prepare the completed field for handover with the agreed inspection, maintenance and care information.
Installation reference photographs from Aneka Usaha’s hockey presentation. The construction scope and sequence depend on the site and specified system.
Selected hockey projects.
A selection of synthetic hockey field projects undertaken by Aneka Usaha across Malaysia.
Padang Hoki Azlan Shah
Ipoh, Perak
Stadium Hoki Universiti Sains Malaysia
Pulau Pinang
Padang Hoki Turf SMK Padang Midin
Kuala Terengganu, Terengganu
Kampus Sultan Azlan Shah, UPSI
Tanjong Malim, Perak
Kompleks Sukan Haji Mohd Said
Seremban 2, Negeri Sembilan
Stadium Hoki Kementerian Pendidikan Malaysia
Jalan Lembah Pantai, Kuala Lumpur
Good planning goes
below the surface.
The turf, shock pad, engineered base and irrigation work together. Plan the field as one complete system, from site preparation to installation, testing and ongoing care.
Discuss your field specification- 01
Ground and drainage
Assess levels, base condition, drainage and any existing surface before setting the construction scope.
- 02
Shock pad and turf
The catalogue’s tested configuration uses Hockey Gold Speed L 13-31 with a 15 mm IS 15 shock pad. Confirm the complete specified system before installation.
- 03
Irrigation
The supplied product certificate states a water application of 3 litres/m², delivered evenly across the field within a maximum of ten minutes. Design the irrigation provision for the agreed system.
- 04
Markings and equipment
Coordinate line markings, run-offs, goals and equipment with the approved field layout.
- 05
Testing, handover and care
Arrange applicable field testing after installation and provide the agreed maintenance and handover information. Product approval alone does not certify the finished field.
Choose your field colour.
Explore green and blue playing surfaces with a contrasting surround to find the combination that suits your facility.
Green field · Green surround
Colour concept only. Confirm available turf colours and the complete specification with our team. Field markings are schematic.
A few things to know.
What hockey turf system is shown here?
The catalogue identifies Hockey Gold Speed L 13-31 IS 15. Its documented configuration comprises non-filled curly monofilament turf with a 13 mm pile and a 15 mm IS 15 shock pad. Ask our team for the current specification.
Does FIH product approval certify my completed field?
No. The catalogue certificate concerns a particular turf and shock-pad system tested in a laboratory. Certification of the installed field is a separate process involving field testing and approval.
Does this system need watering?
Yes, for the Global performance conditions documented in the supplied certificate. It states a water application of 3 litres/m², applied evenly within a maximum of ten minutes. Confirm the irrigation design and operating requirements for your project.
Can I choose green or blue for the field and surround?
The colour designer lets you explore green and blue combinations. It is a visual concept, not confirmation that every colour or combination has the same approval. Confirm available yarn colours and the relevant product documentation with our team.
What warranty is available?
The catalogue includes a manufacturer statement referring to an eight-year warranty. Coverage, exclusions, maintenance obligations and the commencement date are governed by the warranty issued for your project and the agreed terms.
What should I share to start a project?
Send the site location, approximate available area, intended level of play and timeline. Existing drawings or photographs, information on drainage and available water supply will help our team understand the scope.
Let’s plan your hockey field.
Share your site, intended use and project timeline.